| It is essential when installing toilet or shower cubicles to | | | | aligned correctly and fix adjustable legs to the floor. |
| follow procedures. Preparation is the key and to over | | | | Step 5 Fitting Fascia Panels |
| look these simple instructions can cause big problems | | | | Measure up and mark off a vertical line on the side |
| later on in the installation process. Now make sure you | | | | wall if fixing to a wall. Fix the 3 wall brackets the wall. |
| have all the components required to install your cubicle. | | | | Make sure the hinge panel is level and mark off the |
| Just follow these easy to understand instructions, | | | | positions of the 3 brackets on the fascia. Fix the hinge |
| making sure your lines are vertical as you have areas | | | | wall to fascia channel brackets using the T-nuts |
| like floors or walls, which can be out of true, and your | | | | provided. Your pilaster (central fascia panel) will have |
| cubicles will be installed in no time at all. | | | | the hinge holes pre-drilled and simply fix those using the |
| Step 1 Measuring up | | | | T-nuts provided. |
| Measure and mark off a vertical line on the back wall | | | | Step 6 Fitting Head Rail |
| for the positions of the wall partitions for the cubicles. | | | | With the partitions and fascia fixed the head rail must |
| Mark on the wall the positions to fix the three back | | | | be placed in position over the tops of the fascia |
| wall brackets. | | | | bridging the door gap. Fix the head rail permanently by |
| Step 2 Fitting Brackets | | | | attaching to the fascia. |
| Fix the 3 back wall channel brackets as required for | | | | Step 7 Fitting the doors, hinges and lock assembly |
| each partition on the vertical line drawn on the wall. | | | | Attach the hinges to the doors. Attach the indicator |
| Step 3 Fitting Partitions | | | | bolt to the door. Block the doors up to the level of the |
| Position the wall panels into the brackets and ensure | | | | hinge panel bottom using wood and place the door on |
| the partition is level using the adjustable legs fixed to | | | | the blocks. Engage the lock and mark off the indicator |
| the wall panels. | | | | bolt on the fascia at the point you want to attach the |
| Draw the exact position of the holes in the channel | | | | keep. Mark off the hinge placement on the hinge panel. |
| brackets on the walls of each partition ready for drilling. | | | | To drill the hinge holes remove the nut at the bottom |
| Drill the hole using a 10mm drill bit and fix the brackets | | | | of the hinge and reassemble and attach the hinges to |
| to the partition walls using the T-nuts provided. | | | | the walls ensuring the door is hung horizontal. Unlock |
| Step 4 Fitting Partition Support | | | | the indicator bolt and attach the keep using the fixings |
| Check the attached the adjustable leg to the partition, | | | | provided. Set back the plastic sleeves inside the hinge |
| and adjust to correct height. Ensure the partition is | | | | for the door to close closed or open. |